Switching to Gantt CSS

Bring your programmes with you: what Gantt CSS reads, writes and updates from.

Product by product

Reading brings a programme in; writing sends one out for someone who uses another product; updating takes changes from a file into the programme you already have open.

  • Primavera P6

    Reads
    • XER files: opened as a programme, as a baseline, for progress, or many at once in a bulk import
    • P6 XML files, for bulk import, progress and baselines only
    Writes
    • XER files
    Updates from
    • XER files
  • Microsoft Project

    Reads
    • MS Project XML files
    • .mpp files, through Microsoft Project installed on the same PC
    Writes
    • MS Project XML files
    • .mpp files, through Microsoft Project installed on the same PC
    Updates from
    • MS Project XML files
    Good to know
    Without Microsoft Project on the PC, use XML: Gantt CSS reads and writes it on its own.
  • Asta Powerproject

    Reads
    • .pp files, read from a copy so the original is never written to
    Writes
    • .pp files
    Updates from
    Not an update source
    Good to know
    Bring an Asta programme in by importing it, or import it as a baseline.
  • Excel

    Reads
    • Progress from a workbook or a CSV file
    Writes
    • Excel workbooks of the programme
    Updates from
    • Workbooks with a code column, such as a Gantt CSS export you have edited
    Good to know
    A workbook cannot create a new programme: it updates one that is already open.

Update from a file

File ▸ Update from File reads a P6 XER file, an MS Project XML file or an Excel workbook, and brings its changes into the programme you have open.

  1. Matched by activity code

    Each activity in the file is matched to the open programme’s activity with the same code, whatever its case. The programme keeps its own layout, baselines and ids.

  2. You choose what to take

    Progress and the data date, durations, names and notes, constraints, calendars, codes and user fields, links, and new activities. All are ticked to start with.

  3. You see every change first

    Before anything changes, a list shows each activity’s old and new values, the new activities, the activities the file does not have, the links and the data date. Ticking an option updates the list at once.

  4. Nothing is lost by accident

    Activities the file does not have are kept unless you tick the option to delete them. The programme as it was can be kept as a baseline named “Before update” with the date, so you can compare the two.

  5. Doubtful values are left alone

    Progress that cannot be right, codes used twice, activities without a code and links that would close a loop are not applied: they are listed for you to look at.

Many programmes at once

The programme manager’s bulk import takes many programmes in one go: P6, MS Project, Asta and Gantt CSS files, and whole folders. Each is saved as a Gantt CSS programme in its project’s folder.

Baselines live inside the programme file. You can import a programme from another product as a baseline of the one you have open, and compare the two. When you need to send a programme back, write it in the other product’s format from the File menu.

Ready to try it? Download Gantt CSS and open one of your own programmes.