Keep the registers your contract asks for, see every time bar before it falls, and show the delay from the programme you already keep.

  • Add-on, needs Planning
  • JBCC · GCC · NEC · FIDIC
  • Nine delay methods

Choose the form of contract, and the registers, steps and periods follow it. Every rule can then be changed for the programme in hand.

Each register entry shows its next step, the consequence if the date passes, and how close that date is.

Forms of contract

  • JBCC Principal Building Agreement
  • GCC 2015
  • NEC3 ECC
  • NEC4 ECC
  • FIDIC 1999 Red and Yellow
  • FIDIC 2017 Red and Yellow
  • Other

The letters use the form’s own title for the administrator: Principal Agent under JBCC, Employer’s Agent under GCC 2015, Project Manager under NEC and Engineer under FIDIC.

  • Keep the registers

    One register per kind of entry, numbered and dated, each against the same programme.

    • Early warnings, on the forms that have them (not JBCC or GCC 2015)
    • Notices of delay
    • Compensation events
    • EOT claims
    • A fragnet for each entry
  • Watch the time bars

    Each step has a period and a consequence, so you see which date matters and what happens if it passes.

    • Periods in days, working days, weeks, calendar days less holidays, or months
    • Consequences: time bar, deemed accepted, deemed refused, or a reminder
    • “Due soon” from 10 working days before, unless you change it
  • Put deadlines in the diary

    Write the register’s deadlines to an iCalendar file, for the calendar you already use.

  • Record the weather

    A weather register measured against the contract’s allowance, and a rain allowance activity in the programme.

  • Draft the letters

    Seven kinds of letter drafted from a register entry as Word documents, for you to edit before they go out.

    • Early warning; notice of delay and intention to claim
    • Compensation event notification
    • Quotation, claim and interim claim covering letters
    • Notification of failure to reply
  • Draft the narrative

    Draft Narrative uses AI, with your own key, to write from the programme’s facts.

    • Monthly progress
    • Delay narrative
    • Revision change summary
    • Quality findings

Delay analysis

Run the methods the contract and the event call for, side by side, on the programme and its updates.

The nine delay analysis methods
MethodWhat it shows
Time impact, each event aloneThe fragnet of one event added to the programme on its own.
Time impact, events added in date orderEvents added one after another, in the order they happened.
Impacted as-plannedEvery event added to the as-planned programme.
WindowsEach update period’s slip, shared out between the events in it.
Half-stepEach update period split into progress and revisions; an event gets the progress delay on its own activities and the effect of revisions to them.
As-planned vs as-builtThe overrun on the critical work.
Collapsed as-built, each event aloneOne event taken out of the as-built programme.
Collapsed as-built, events in turnEvents taken out of the as-built programme one after another.
Weather registerDays beyond the allowance that fell on critical work (and, once activities are marked weather-sensitive, only on those).
Windows: each update period’s slip, and the running total.
  • Concurrency counted once
  • Pacing candidates listed
  • An as-built record of the actual dates at every update
  • A run fingerprint, so a run can be shown to reproduce
  • Save any analysis view as a programme

The delay analysis guide

Time bars

These are the defaults Gantt CSS starts from for NEC and FIDIC. Every one can be changed per programme: check them against your contract.

Default periods for NEC and FIDIC in Gantt CSS
FormStepDefaultIf it passes
NEC3 and NEC4Contractor notifies a compensation event8 weeksTime bar
NEC3 and NEC4Project Manager replies to the notification1 weekReminder
NEC3 and NEC4Contractor submits the quotation3 weeksReminder
NEC3 and NEC4No reply after the contractor’s notice of failure to reply2 weeksDeemed accepted
FIDIC 2017Notice of claim28 daysTime bar
FIDIC 2017Fully detailed claim84 daysTime bar
FIDIC 2017Engineer’s agreement, then determination42 + 42 daysDeemed refused
FIDIC 2017Notice of dissatisfaction28 daysTime bar
FIDIC 1999Notice of claim28 daysTime bar
FIDIC 1999Fully detailed claim42 daysReminder

JBCC and GCC 2015 have their own steps in the app. Set their periods from your edition of the contract. More in the contract time bars guide.

In and out

The add-on works on the programme Planning keeps: the baseline, the updates and the as-built dates.

What the Contract add-on produces
OutputFormatWhat it holds
Overall delay registerExcel and A3 PDFEvery method’s days, reconciliation against the windows, an event by window matrix, a Scott schedule and a guide to the methods.
Combined EOT reportA4 PDFThe contract, the events and whether their notices were in time, the weather, the delay analyses, and the programme as an appendix.
Claim packA folderA claim’s submission set: the as-built, the programmes behind the analysis and its report. Packing again starts the next revision.
LettersWordSeven kinds of draft, from the register entries.
DeadlinesiCalendar fileThe register’s due dates, for your calendar.
Analysis programmesGantt CSS programmeAny analysis view, saved as a programme of its own.

Before you buy

What the Contract module needs
LicencePlanning. This is an add-on: every order includes Planning, and add-ons are bought on top of it.
SoldPer named user, per year.
PCsWindows 10 or later. Gantt Planning issues a licence for each of up to two PCs per named user; to move one, choose Release licence in the app and ask us for a new one.