Construction scheduling software by Gantt Planning

Construction scheduling built to stand up to scrutiny.

Gantt CSS is desktop planning software for construction. Build and update critical-path programmes to the working day and keep every baseline in the file. Add contract registers and delay analysis, estimating or a 3D model when you need them.

  • Windows desktop
  • Works offline
  • P6 XER and MS Project XML in and out
Demo programme · Office block
An animated construction programme: eight activities from site establishment to practical completion, with the critical path highlighted and a data-date line.Feb 27Mar 27Apr 27May 27A100A110A120A125A140A160A176M900DATA DATE
  • Critical path to the working day
  • Double links
  • Ten constraint types
  • South African public holidays
  • Builders’ break
  • Baselines in the file
  • Progress line
  • Resource histograms
  • S-curves
  • Cash flow
  • Earned value
  • DCMA 14-point assessment
  • Schedule risk
  • Look-ahead and PPC
  • P6 XER in and out
  • MS Project XML in and out
  • A4 to A0 and PDF

Made by planners

Gantt Planning is a South African construction planning consultancy. We build, update and analyse programmes for clients, and Gantt CSS is the software we wrote to do that work.

It schedules exactly, keeps the record of every change, and reads and writes the files your clients and contractors already use.

A programme is only as good as the logic behind it, the calendar under it, and the record of how it changed.

  • 01

    Exact scheduling

    Logic, lags and calendars worked out to the working day, the way planners check them by hand.

  • 02

    A record of change

    Every baseline and progress update is kept in the programme file, so you can show what moved, when and why.

  • 03

    Local by design

    Programmes are files on your own computer, and the software keeps working offline.

Capabilities

The Planning module is part of every order and covers the full life of a construction programme.

  • Critical-path scheduling

    Forward and backward passes to the working day, with float, constraints and the longest path.

    • Finish-to-start, start-to-start, finish-to-finish and start-to-finish links, with lags on the calendar you choose
    • Double links for overlapping work
    • Ten constraint types, as late as possible among them, and paths to a milestone
  • Calendars that know South Africa

    Work weeks, hours per day, public holidays, the builders’ break and site shutdowns.

    • Public holidays for South Africa and most other countries, checked for updates online
    • The builders’ break, the Western Cape building industry break and the civil engineering shutdown
    • A calendar per activity
  • Baselines and updates

    Keep every baseline and progress update in the file, draw the active baseline and two more under the bars, and see each slip in working days.

    • Move the data date and record actuals
    • Compare any two versions side by side
    • Progress line and variance columns
  • Resources, curves and earned value

    Histograms by day, week or month, S-curves on early and late dates, cash flow and earned value.

    • Over-allocation shown against limits
    • Planned, forecast and actual progress
    • SPI(t), BEI, CPLI and TSPI on the dashboard
  • Schedule quality checks

    A quality score and a DCMA 14-point assessment, before the programme goes to the client.

    • Open ends, lags, constraints and float
    • Missed activities and baseline execution
    • Findings to PDF and Word
  • Print, PDF and Excel

    Print A4 to A0 or PDF with a title block and logos, and export workbooks with real Excel dates and numbers.

    • Pages across or fit to width
    • Histograms and S-curves on the sheet
    • Print sets and annexures for the monthly report

Planning, and three add-ons

Every order includes Planning. Add the modules your work needs, priced per user, and add more at any time.

  • PlanningIn every order

    Programmes, logic, calendars, baselines, progress, resources, the dashboard and the quality checks.

    About Planning module
  • ContractAdd-on

    Registers and notice deadlines for JBCC, GCC 2015, NEC and FIDIC, nine delay analysis methods and the EOT report.

    About Contract module
  • EstimatingAdd-on

    Bills of quantities with rate build-ups and adjudicators. Take-off on PDF drawings has its own Measurement area.

    About Estimating module
  • ModelAdd-on

    Open IFC, glTF, OBJ and FBX models, link elements to activities and show planned against built.

    About Model module

Why Gantt CSS

With the Contract add-on, Gantt CSS carries on past the bar chart to the notice, the claim and the analysis behind it.

contract forms set up
6contract forms set upJBCC PBA, GCC 2015, NEC3, NEC4, FIDIC 1999 and 2017, in the Contract add-on
delay analysis methods
9delay analysis methodsTime impact and collapsed as-built two ways each, impacted as-planned, windows, half-step, as-planned vs as-built and weather
programme formats read and written
3programme formats read and writtenP6 XER, MS Project XML and .mpp, Asta Powerproject; .mpp through Microsoft Project on the same PC
baselines on screen at once
3baselines on screen at onceThe active baseline and two more, drawn under the bars
  1. Delay analysis in the Contract add-on

    Registers for early warnings, notices of delay, compensation events and extension-of-time claims, kept with the programme. Run nine delay analysis methods, from time impact and windows analysis to collapsed as-built, then issue one combined EOT report as a PDF with the programme as its appendix.

    • Time impact analysis
    • Windows analysis
    • As-planned vs as-built
    • Collapsed as-built
  2. Set up for the contracts you sign

    Contract set-up for JBCC PBA, GCC 2015, NEC3, NEC4, FIDIC 1999 and FIDIC 2017. Each notice and reply has a period in the unit the form uses (days, working days, weeks, calendar days less holidays or months) and a consequence such as a time bar or deemed acceptance, and every rule can be edited per programme. Weather days are set against the allowance.

    • JBCC PBA
    • GCC 2015
    • NEC3 and NEC4
    • FIDIC 1999 and 2017
  3. Exact with the files you already have

    Opens and writes Primavera P6 XER, Microsoft Project XML and Asta Powerproject files, and updates an open programme from P6, MS Project or Excel. Dates, durations, lags and calendars are kept as they are, and an update lists every change before it is applied.

    • P6 XER
    • MS Project XML
    • Asta Powerproject
    • Excel
  4. Your programmes stay on your desk

    A Windows desktop application that works offline. Programmes are saved as files on your computer or network, and nothing is uploaded unless you use the optional AI drafting: then the facts it needs go to the AI provider you choose, with your own key, after you agree. Each user’s licence runs on two PCs.

    • Windows
    • Offline
    • Files on your PC

Live programme

A small building programme, scheduled in your browser with the same forward and backward pass Gantt CSS runs. Apply a delay and see whether it uses float or moves completion.

Apply a delay or an acceleration

Practical completion
12/07/27
Against baseline
±0 d
Critical
9 of 12
A100Site establishment05/02/27 · critical5 working days
A110Bulk earthworks19/02/27 · critical10 working days
A120Foundations12/03/27 · critical15 working days
A125Lift procurement14/05/27 · 11 d float70 working days
A130Ground-floor slab24/03/27 · critical8 working days
A140Structural frame28/04/27 · critical25 working days
A150Roof structure and covering14/05/27 · 23 d float12 working days
A160Brickwork and plaster26/05/27 · critical20 working days
A170Services first fix16/06/27 · critical15 working days
A176Lift installation01/06/27 · 11 d float12 working days
A180Finishes12/07/27 · critical18 working days
M900Practical completion12/07/27 · criticalmilestone
02/04/27
Planned complete
40%
Done
4 done
In progress
2 on site
Not started
6 to start

Critical path Has float Total float Baseline Planned progress Data date

A simplified demonstration with finish-to-start links on a five-day week. Gantt CSS itself handles every link type, calendars and progress.

Screens

Six screens from Gantt CSS itself. Drag through them, let them play, or open any one full screen and zoom in.

Gantt CSS in its dark theme: the activity grid beside a Gantt chart of the sample two-storey office building, with logic links and critical activities in red.

01 / 06 · Planning

Grid and Gantt chart

Codes, durations, dates and total float beside the bars, with logic links and the critical path in red.

How it works

One file carries the programme through the job: every baseline, update and analysis stays with it.

  1. Step 01

    Build or bring it in

    Start a new programme or import a P6 XER, an MS Project file or an Asta Powerproject file. Codes, calendars and logic come with it.

  2. Step 02

    Agree the baseline

    Run the quality checks, then keep the agreed programme as a baseline. Every baseline stays in the programme file.

  3. Step 03

    Update every period

    Move the data date, record actual dates and remaining durations, and keep each update with the programme.

  4. Step 04

    Report

    Print the monthly pack: the Gantt chart, histograms, S-curves, earned value and the change log, on any paper size or as PDF.

  5. Step 05

    Show why time was lost

    With the Contract add-on, register the events, run the analyses and issue the extension-of-time report, with the programme as its appendix.

Proof, not promises

Scheduling software is only useful if its dates can be trusted. These are the checks behind Gantt CSS.

  • A reference test suite

    The scheduler has its own suite of reference tests: programmes whose dates are known, scheduled again and checked date by date.

  • Files checked both ways

    Programmes written to P6 XER, MS Project XML and Asta Powerproject are read back in tests and checked for the same dates, durations, lags and calendars.

  • Used on client work

    Gantt Planning plans and updates its own client programmes in Gantt CSS, so problems are found on real jobs first.

FAQ

Something else on your mind? Ask it in the form and we will reply by email.

What is Gantt CSS?

Gantt CSS is construction scheduling software made by Gantt Planning, a South African construction planning consultancy. Its Planning module builds and updates critical-path programmes and keeps baselines and progress updates. Add-on modules cover contract registers and delay analysis, estimating, and 3D models linked to the programme.

Can Gantt CSS open Primavera P6 and Microsoft Project files?

Yes. It imports and exports Primavera P6 XER files and Microsoft Project XML files, keeping dates, durations, lags and calendars as they are. Microsoft Project .mpp files open and save through Microsoft Project when it is installed on the same PC. Gantt CSS can also update an open programme from a P6 XER or Microsoft Project XML file and list every change before it is applied.

Which contracts does the Contract add-on support?

JBCC PBA, GCC 2015, NEC3 ECC, NEC4 ECC, FIDIC 1999 and FIDIC 2017 (Red and Yellow Books), and Other for any other contract. Each notice and reply has its period in the unit the contract uses (days, working days, weeks, calendar days less holidays or months), and every rule can be edited to match the particular conditions of your contract.

Which delay analysis methods are included?

The Contract add-on has nine: time impact analysis (each event on its own, or events added in date order), impacted as-planned, windows analysis, half-step, as-planned versus as-built, collapsed as-built (each event on its own, or events taken out in turn) and the weather register. The results come together in an overall delay register and one extension-of-time report as a PDF, with the programme as an appendix.

What do the add-on modules add?

Planning is part of every order. Contract adds the contract registers, notice deadlines, the weather register and delay analysis. Estimating adds bill files with rate build-ups, adjudicators and estimate import; take-off on PDF drawings has its own Measurement area, which comes with Estimating. Model opens IFC, glTF, OBJ and FBX models, links their elements to activities and shows planned against built.

Is estimating linked to the programme?

No. Estimates are separate bill files: a bill of quantities with rate build-ups, resources, summaries with VAT and trade totals. The programme’s WBS or code values can be copied in as take-off locations, but the bill does not drive the programme.

Does it run on a Mac or in a browser?

Gantt CSS is a Windows desktop application. It is installed on your computer and does not run in a web browser.

Do I need an internet connection, and where are my programmes stored?

Gantt CSS works offline. Programmes are saved as files on your own computer or network, and nothing is uploaded unless you use the optional AI drafting. It goes online to look for updates.

What do the AI features send, and where?

The AI features are optional: the progress report, and the Contract add-on’s draft narratives. Both are drafted by the AI provider you choose, with your own API key, which is stored encrypted on your PC, and nothing is sent until you agree. The progress report sends the period (the baseline and update names and their data dates), activity codes and names, headings, dates, float and progress figures, milestones, the look-ahead, constraints, procurement, change-log reasons and the kinds of notes you choose, without their authors; with the Contract add-on, also register numbers, titles, dates and weather days. The draft narratives send activity codes and names, heading names, baseline, update and revision names, register entry numbers, titles, responsibility and dates, change-log reasons and document references, calendar names, quality check names and the figures. Neither sends the programme file, the programme’s name, costs, resources, user fields, code values, attachments or user details.

How does the free trial work?

Ask for a trial through the enquiry form and we will reply by email.

How is Gantt CSS licensed and priced?

As a yearly subscription for each named user. Gantt Planning issues a licence for each of up to two PCs per named user: install Gantt CSS, send us the request code its licence screen shows, and we send back a licence for that PC. To move one, choose Release licence in the app and ask us for a new one. Planning is part of every order, and Contract, Estimating and Model are add-ons. Every update is included while the subscription runs. Ask for a quote through the enquiry form.

Request a demo

Tell us a little about your work and we will arrange a walkthrough. You are welcome to bring a P6 or MS Project file.

  1. 1

    You send the form

    It goes straight to the Gantt Planning team.

  2. 2

    We reply by email

    To set a time that suits you.

  3. 3

    We walk you through it

    On the sample programme or a file of yours.

Request a demo

All fields are required unless marked optional.

The kind of projects you plan, the software you use now, and anything you would like to see.

We use your details only to reply to you. Read the privacy policy.